Water supply to be affected

    06-Nov-2020
|
IMPHAL, Nov 6: Public Health Engineering Department (PHED) Manipur has informed the general public that the main pipeline from Kangchup to Iroisemba will be shifted due to construction of a new bridge at Lamsang.
Normal supply to consumers of Lamsang, areas covered by Langjing Reservoir, Tera, Iroisemba, Uripok, Lamphel, Nagamapal, Paona Bazar, Sagolband Salam Leikai, Wahengbam Leikai, Babupara and Keishamthong Kabui Khul will be affected on November 8 and 9.